PARTIAL DISCHARGE OF CONDITION 02 (CEMP) OF 24/0911 S73 APPLICATION TO VARY CONDITION 1 (APPROVED PLANS) OF 20/0860 PROPOSED SIDE/ROOF EXTENSION TO EXISTING GARAGE AND CONVERSION TO ANNEX. AMENDMENTS INCLUDE VARIATION TO THE DESIGN OF THE SIDE EXTENSION
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
16th September 2025
INSTALLATION OF BELOW GROUND CABLES, ALTERATIONS TO ELECTRICAL BANKING COMPOUND INCLUDING RAISING GROUND LEVELS, ADDITIONAL ACCESS AND FENCING, AND ALL ASSOCIATED WORKS
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
29th June 2025
PARTIAL DISCHARGE OF CONDITIONS 4 (VERIFICATION REPORT) AND 5 (MONITORING PLAN) OF 23/0835 S73 APPLICATION TO VARY CONDITION 1 (APPROVED PLANS) AND CONDITION 02 (SITE INVESTIGATION AND RISK ASSESSMENT) OF 22/0823 INSTALLATION OF A 230 MW BATTERY ENERGY STO
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
12th June 2025
PARTIAL DISCHARGE OF CONDITIONS 6 (LEMP) AND 22 (MONITORING AND MAINTENANCE SURVEYS) OF 23/0835 S73 APPLICATION TO VARY CONDITION 1 (APPROVED PLANS) AND CONDITION 02 (SITE INVESTIGATION AND RISK ASSESSMENT) OF 22/0823 INSTALLATION OF A 230 MW BATTERY ENERG
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
9th June 2025
PARTIAL DISCHARGE OF CONDITION 2 (CONTAMINATION) OF 25/0213 VARIATION OF CONDITION 01 (APPROVED PLANS AND DOCUMENTS) OF PLANNING PERMISSION 23/0949 FOR BATTERY ENERGY STORAGE SYSTEM WITH ASSOCIATED INFRASTRUCTURE AND WORKS, TO AMEND THE APPROVED DESIGN
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
29th May 2025
REMOVAL OF STORED PULVERISED FUEL ASH (PFA) AND THE INSTALLATION OF A NEW BATTERY ENERGY STORAGE SYSTEM (BESS) WITH ALL ASSOCIATED DRAINAGE, INFRASTRUCTURE, ENGINEERING AND ASSOCIATED UTILITIES CONNECTIONS
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
23rd May 2025
PARTIAL DISCHARGE OF CONDITIONS 7 (BATTERY SAFETY MANAGEMENT PLAN) AND 8 (REPLACEMENT BATTERY UNIT SCHEME) OF 23/0835 S73 APPLICATION TO VARY CONDITION 1 (APPROVED PLANS) AND CONDITION 02 (SITE INVESTIGATION AND RISK ASSESSMENT) OF 22/0823 INSTALLATION OF
Uskmouth Power Station, Land Adjacent To West Nash Road Nash Newport NP18 2BZ
20th March 2025
VARIATION OF CONDITION 01 (APPROVED PLANS AND DOCUMENTS) OF PLANNING PERMISSION 23/0949 FOR BATTERY ENERGY STORAGE SYSTEM WITH ASSOCIATED INFRASTRUCTURE AND WORKS, TO A
Uskmouth Power Station West Nash Road Nash Newport South Wales NP18 2BZ
29th November 2024
EIA SCOPING OPINION FOR A PROPOSED BATTERY ENERGY STORAGE SYSTEM
Melrose West Nash Road Nash Newport NP18 2BZ
14th November 2024
S73 APPLICATION TO VARY CONDITION 1 (APPROVED PLANS) OF 20/0860 PROPOSED SIDE/ROOF EXTENSION TO EXISTING GARAGE AND CONVERSION TO ANNEX. AMENDMENTS INCLUDE VARIATION TO THE DESIGN OF THE SIDE EXTENSION
Orb Works Stephenson Street Newport South Wales NP19 0RB
11th September 2024
PARTIAL DISCHARGE OF CONDITION 2 (DEMOLITION AND CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN) OF 23/0477 PROPOSED CLASS B1(C)/B2/B8 DEVELOPMENT (PHASE 1) TOGETHER WITH ASSOCIATED DEMOLITION/ELEVATIONAL TREATMENT, PARKING, LANDSCAPING, DRAINAGE, ECOLOGICAL ENH
Orb Works Stephenson Street Newport South Wales NP19 0RB
6th August 2024
PARTIAL DISCHARGE OF CONDITIONS 3 (SCHEME TO DEAL WITH CONTAMINATION RISK), 4 (DETAILS OF PILING OR OTHER PENETRATIVE METHODS), 6 (SCHEME OF SOFT LANDSCAPING), 7 (ECOLOGICAL ENHANCEMENT) AND 8 (FOUL AND SURFACE WATER DRAINAGE) OF 23/0477 PROPOSED CLASS B1(
Coronation Park Stephenson Street Newport NP19 0RB
18th April 2024
PROPOSED ALTERATIONS AND ENLARGEMENT TO EXISTING FOOTBALL PITCH AND RAILINGS, PROPOSED FOOTPATH AND SPECTATOR STAND
Great House Farm West Nash Road Nash Newport NP18 2BZ
14th March 2024
S73 APPLICATION TO VARY CONDITION 01(IMPLEMENTATION TIME) AND 19 (BUFFER ZONE) OF PLANNING PERMISSION 11/1351 FOR THE CONSTRUCTION OF TEMPORARY OIL/GAS EXPLORATION DRILLING SITE AND ASSOCIATED WORKS, THE CREATION OF PERIMETER BUND, VEHICULAR ACCESS, AND TH
Land At Uskmouth Power Station West Nash Road Nash Newport NP18 2BZ
15th December 2023
NON MATERIAL AMENDMENT APPLICATION TO AMEND THE DESCRIPTION OF DEVELOPMENT IN RESPECT OF 23/0835 S73 APPLICATION TO VARY CONDITION 1 (APPROVED PLANS) AND CONDITION 02 (SITE INVESTIGATION AND RISK ASSESSMENT) OF 22/0823 INSTALLATION OF A 230 MW BATTERY ENER
The Shrubbery Straits Lane Nash Newport NP18 2BY
10th October 2023
RETROSPECTIVE APPLICATION FOR A SINGLE STOREY REAR EXTENSION WITH BALCONY ABOVE
Uskmouth Power Station West Nash Road Nash Newport South Wales NP18 2BZ
18th August 2023
PARTIAL DISCHARGE OF CONDITIONS 2 (CONTAMINATION), 3 (LEVELS), 4 (DRAINAGE STRATEGY), 6 (CEMP), 7 (TEMPORARY ACOUSTIC BARRIER), 8 (TIMETABLE FOR ECOLOGICAL ENHANCEMENTS) OF 22/0823 INSTALLATION OF A 230 MW BATTERY ENERGY STORAGE SYSTEM (BESS)
Great House Farm West Nash Road Nash Newport NP18 2BZ
5th July 2023
PARTIAL DISCHARGE OF CONDITIONS 3 (NOISE MITIGATION), 5 (COLOUR OF BUILDINGS), 6 (LIGHTING DETAILS) AND 7 (CONTAMINATION VERIFICATION REPORT) OF 17/1215 VARIATION OF CONDITIONS 01 (IMPLEMENTATION TIME) AND 19 (BUFFER ZONES) OF PLANNING PERMISSION 11/1351 F
Orb Works Stephenson Street Newport South Wales NP19 0RB
14th June 2023
PROPOSED CLASS B1/B2/B8 DEVELOPMENT (PHASE 1) TOGETHER WITH ASSOCIATED DEMOLITION/ELEVATIONAL TREATMENT, PARKING, LANDSCAPING, DRAINAGE, ECOLOGICAL ENHANCEMENT AND PROVISION OF IMPROVED PEDESTRIAN/CYCLIST FACILITIES
Uskmouth Power Station West Nash Road Nash Newport South Wales NP18 2BZ
2nd June 2023
NMA APPLICATION TO VARY CONDITION 24 (CONSTRUCTION HOURS) OF PLANNING PERMISSION 22/0823 INSTALLATION OF A 230 MW BATTERY ENERGY STORAGE SYSTEM (BESS) TO ALLOW FOR DELIVERIES OF AGGREGATE BY RAIL
Great House Farm West Nash Road Nash Newport NP18 2BZ
1st June 2023
CERTIFICATE OF LAWFULNESS FOR EXISTING DEVELOPMENT COMPRISING THE CONSTRUCTION OF TEMPORARY OIL/GAS EXPLORATION DRILLING SITE AND ASSOCIATED WORKS, THE CREATION OF PERIMETER BUND, VEHICULAR ACCESS, AND THE SITING OF DRILLING RIG TO CONFIRM COMMENCEMENT OF
The Willows Broad Street Common Nash Newport NP18 2AZ
14th April 2023
PROPOSED REAR TWO STOREY EXTENSION, SINGLE STOREY SIDE/REAR EXTENSION TO INCLUDE EXTENSIVE REMOVAL OF EXISTING REAR SINGLE STOREY EXTENSION (RESUBMISSION FOLLOWING REFUSAL OF 21/1196)
Tatton Farm Tatton Lane Nash Newport NP18 2BE
10th March 2023
LISTED BUILDING CONSENT FOR REPAIR WORKS TO EXISTING PROPERTY TO ENSURE THE INTEGRITY OF THE STRUCTURE AND TO PROVIDE SECURITY MEASURES
Holly Cottage Broad Street Common Nash Newport NP18 2AZ
16th February 2023
CERTIFICATE OF LAWFULNESS FOR EXISTING USE OF LAND AS RESIDENTIAL GARDEN (RESUBMISSION OF 21/0990)
Brookfield Nash Road Newport NP18 2BW
14th February 2023
DEMOLITION OF EXISTING CONSERVATORY AND GARAGE,ERECTION OF A TWO STOREY SIDE EXTENSION, SINGLE STOREY REAR EXTENSION AND A FRONT PORCH (REVISION TO PLANNING PERMISSION 22/0323)